The pressure to release new models quickly to the market has never been higher. As a result, the development of conceptualisation and design tools have significantly evolved in 3D virtual design environments, simulation engineer, and rapid prototyping. Such breakthroughs achieve shorter development time, but commissioning new plants costs valuable time to market.

Alan Stapelberg, BIW Product Manager, presents on how new technology can help OEM's achieve rapid production for new production models faster than ever before.
 

To view this webinar on an iPhone, iPad or iPod touch please download the free GoToMeeting.

 

This webinar was presented by:

Alan Stapelberg

Alan graduated with a Bachelor of Engineering (Infomechatronics). He specialises in robotics, particularly for flexible production lines in automotive assembly. He has been based at ABB's robotics headquarters in Shanghai for over six years.

ABB Robotics is a leading supplier of industrial robots - also providing robot software, peripheral equipment, modular manufacturing cells and service for tasks such as welding, handling, assembly, painting and finishing, picking, packing, palletizing and machine tending. Key markets include automotive, plastics, metal fabrication, foundry, electronics, machine tools, pharmaceutical and food and beverage industries. A strong solutions focus helps manufacturers improve productivity, product quality and worker safety. ABB has installed more than 200,000 robots worldwide.